Challenge

A company operating a mature data platform based on IBM DataStage faced escalating costs and operational friction. Each release required approximately five days of manual deployment effort, the process was error-prone, and the on-premise licensing and infrastructure costs continued to rise. The deployment bottleneck consumed a significant share of the team’s capacity, leaving less time for development work that would deliver business value.

The combination of high manual effort, growing license costs, and increasing fragility made the legacy platform a liability rather than an asset. A modernization path was needed that would reduce operational overhead while preserving the business logic embedded in the existing ETL jobs.

Approach

Alligator Company led a phased migration from IBM DataStage to dbt on Snowflake, completed within 12 weeks. Rather than a big-bang replacement, the migration proceeded in stages: the team mapped existing DataStage jobs to equivalent dbt models, validated outputs against the legacy system, and switched over incrementally. This minimized risk and allowed the team to build confidence with the new tooling during the transition.

Manual deployment was replaced entirely by an automated CI/CD pipeline using GitHub Actions. What previously required five days of manual coordination now runs as an automated process triggered by code commits. The on-premise IBM DB2 and DataStage infrastructure gave way to Snowflake as the cloud data warehouse. Hardware maintenance was eliminated, and elastic compute scaling became available.

Alongside the technical migration, the team was trained on Analytics Engineering practices: version control for all transformations, automated testing with dbt tests, modular SQL models, and documentation as code. The result was a development culture that extends beyond the tooling change itself.

Outcome

Automated CI/CD replaced the five-day manual deployment process entirely. The reduction in operational overhead freed one team member to shift from deployment tasks to development work that delivers direct business value. New features and changes now reach production in days rather than weeks.

  • Deployment effort reduced from five days to minutes
  • Operating costs down by 30-50% through elimination of on-premise licensing, infrastructure maintenance, and manual deployment labor
  • Team responsiveness to business requirements improved significantly